Perform Installation Qualification (IQ) in Pharmaceutical Industry

Following qualification study to be perform during Installation qualification but not limited to
·         Training sheet (For keep the training attendance )
·         Purchase order verification (To match with PO)
·         Drawing verification (To verify GA drawing, Electrical drawing etc.)
·         Document verification (To verify Installation manual, operation manual, test certificate etc)
·         Prestart review (For clearance of start IQ)
·         Major component verification
·         Material of construction verification (MOC 316L/304 etc.)
·         Critical instruments calibration verification
·         Utility connection verification
·         Deviation and corrective action
·         List of recommended Spare parts and Lubricants
·         Identification of standard operating procedure

No comments:

Post a Comment

Featured Post

Complication in Pharma industry with stability issue and salary expectation in Indian scenario

Now a days the pattern of interview is very interesting in pharma industry. The main argument comes with following points, Exp...